The Challenge
A 2 MW data hall in a temperate climate needed to hold inlet air near 24 C while exhausting hot server air year round. Running compressors for all of that conditioning was the largest cost line.
The Solution
Engineers added a rotary enthalpy wheel between the exhaust and supply air streams, combined with an economiser cycle. In cool months the wheel plus free cooling carried most of the load; compressors ran only during peaks.
Results
- Supply air pre-conditioned before the coil, cutting compressor hours
- Latent recovery reduced dehumidification energy in humid spells
- Measured annual cooling energy down by roughly a third
Lesson
For always-on loads, even a modest effectiveness gain compounds into large savings because the system runs 8,760 hours a year. Recovery pays back faster where run time is continuous.