Air-to-Air Heat Exchangers & Heat Recovery · Since 2005

Heat Exchanger Cleaning and Maintenance SOP

Why a SOP

A fouled core loses effectiveness and raises fan energy. A written procedure keeps performance up and warranty valid.

Annual Inspection

  • Record supply-air temperature and pressure drop as baseline
  • Inspect the core for dust, grease, or condensate buildup
  • Check rotary seals, belt, and bearings if fitted

Cleaning Steps

  1. Switch the unit off and lock out power
  2. Remove filters and vacuum loose dust from the core faces
  3. Wash with low-pressure water and a neutral cleaner; never use high pressure that bends foils
  4. For greasy exhaust, use a degreaser suited to the media
  5. Rinse, dry, and refit; confirm drainage is clear

Rotary Wheels

Clean the media per the manufacturer schedule, inspect seals, and verify the drive. Log every service with the date and readings.

What This Product Does

This unit is built as a compact air-to-air heat exchanger that transfers thermal energy between two separate air streams without allowing them to mix. Warm exhaust air passes over one side of the core while cooler supply air passes over the other, and the temperature difference drives heat from the warm stream to the cool one. The result is pre-conditioned make-up air that needs far less external heating or cooling, which lowers the load on the building or process system.

Construction and Materials

The core is formed from corrugated aluminium or stainless-steel plates bonded into a counter-flow pack, with sealed channels that keep the two air paths isolated. Frames are typically galvanised or powder-coated steel, and service doors give access for inspection and cleaning. Gasket materials are selected for the operating temperature and any mild chemical exposure, so the unit stays reliable in demanding ventilation duties.

Where It Fits

In the Heat Exchanger Cleaning and Maintenance SOP configuration the exchanger is suited to HVAC make-up air units, paint and coating ovens, food and pharmaceutical drying, and general process ventilation where energy cost is a concern. It can be mounted horizontally or vertically to match the available plant layout, and it connects with standard flanged ductwork for straightforward integration with existing fans.

Frequently Asked Questions

Does it need power to operate? The passive core needs no electricity; only the associated fans and controls consume power. How often should it be cleaned? Inspect at least once per season and clean the exhaust side when temperature recovery begins to drop.

Practical Selection Checklist

For the Heat Exchanger Cleaning and Maintenance SOP duty, confirm the measured airflow and the temperature difference between the two airstreams before specifying any unit. Choose the core type that matches the exhaust cleanliness and the recovery target, allow margin for fouling, and verify the pressure drop stays inside the fan curve. Place filtration ahead of the core and provide a condensate drain where the supply side may fall below the dew point.

When to Specify This Solution

Energy recovery suits any plant or building that expels warm exhaust continuously while drawing in fresh air that must be conditioned from ambient. Common candidates include make-up air units, drying rooms, commercial kitchens, paint booths, and general process ventilation. Where the annual cost of heating or cooling make-up air is material, a correctly sized exchanger usually pays back within one to three operating seasons.

Next Steps

Start by logging the supply and exhaust conditions for a full duty cycle, then size the core from those numbers rather than from nameplate estimates. Compare the projected energy saving with the equipment and installation cost to get a payback figure, and review the comparison and product guides for the specific configuration that fits your site.

Leave a Reply

Request a Quote
Need Help?