The Building
An older office, 10,000 m3/h constant-volume exhaust, heated winters, no recovery. Goal: cut the ventilation heating load cheaply.
Step 1 - Duty
Supply and exhaust both 10,000 m3/h, outdoor winter -5 C, indoor 21 C, desired supply at least 16 C.
Step 2 - Technology
Choose a crossflow plate core: simple, low maintenance, no humidity need in this climate.
Step 3 - Size
Target 70 percent effectiveness. At 20 K difference that recovers about 46 kW of heating load.
Step 4 - Fan Check
Confirm the existing fan can handle the added ~120 Pa. If not, plan a fan upgrade.
Step 5 - Result
Ventilation heating load cut by roughly two-thirds; payback within a few heating seasons.